- New!
RCC-CW 2023
Reference: AFC302
€1,500.00
unit price Tax excluded
Rules for design and construction of PWR nuclear civil works
Type:
Main edition
Edition year:
2023
Free Shipping
Our documentsare under copyright
The AFCEN RCC-CW 2023 Edition includes the following improvements:
- Requirement engineering for part G (GTABL, GREFD, GDEFN, GGENP, GA)
- New section for climate change (DGENR)
- Modification of the action covering the temperature variation of pool water in case of severe accident (DGENR)
- Evolution concerning displacement approach (DGEOT)
- Addition of the in-service temperature of concrete in the RCC-CW (DCONC)
- Modification of strain criteria for liner with shape defects (DCLIN, CCLIN)
- Impact of EN 1090-2 evolution (DSTLW, CSTLW, CCLIN, CPLIN)
- Extension of the chapters about bonded anchors and post-installed anchors (DANCH, CANCH)
- Introduction of the EAD 330008-03-0601 (DANCH, CANCH)
- Evolution concerning uncertainty management and nonlinear SSI (DA)
- Clarification of the appendix DE (New sketches and tables)
- Addition of the notion of third-party body for welding procedure qualifications and welder qualifications (CCLIN, CPLIN)
- Requirement engineering for part AM (AMGENR, AMGEOT, AMCONC, AMCONT)
- AMANCH: Ageing management for anchor systems (new chapter).
Collaboration and expertise
Let’s take part in codes update
You would like to modify a code, you can send your proposal to the relevant code subcommittee: download and complete the application form, then send the form to the subcommittee email address.
You would like to understand the interpretation of a paragraph of the code: download the application form, enter your question and send the form to the email address of the relevant subcommittee.
You want to benefit the nuclear industry from your feedback as a code user, share your expertise with AFCEN: download and complete the application form, then send it to the email address of the relevant subcommittee.