Free
AFCEN-RS-17-022-A
Reference: AFC305
€0.00
unit price Tax excluded
Professional guide for the design and manufacture of PPPs intended for CPP or CSP ESPNs
A more recent version exists
AFCEN-RS-17-022-C
A more recent version exists
AFCEN-RS-17-022-C
Type:
PTAN
Edition year:
2018
Free Shipping
Our documents are under copyright
This guide applies to the design and manufacture of PPPs intended for N1 level ESPNs of the CPP-CSP, subject to the operating order [5] regardless of the manufacturing regime of the ESPN for which they are intended.
CPP: Main Primary Circuit
CSP: Main Secondary Circuit
[5] Order of 10/11/1999 amended relating to the monitoring of the operation of the main primary circuit and the main secondary circuits of pressurized water nuclear reactors known as the "operating order"
CPP: Main Primary Circuit
CSP: Main Secondary Circuit
[5] Order of 10/11/1999 amended relating to the monitoring of the operation of the main primary circuit and the main secondary circuits of pressurized water nuclear reactors known as the "operating order"
-
AFCEN-RS-17-022-AGuide professionnel pour la conception et la fabrication des PPP destinées à des ESPN du CPP ou CSP
Collaboration and expertise
Take part in updating the codes
If you would like to modify a code, you can send your proposal to the relevant code subcommittee: download and complete the application form, then send the form to the subcommittee email address.
If you would like to understand the interpretation of a paragraph of the code: download the application form, enter your question and send the form to the email address of the relevant subcommittee.
If you want to benefit the nuclear industry from your feedback as a code user, share your expertise with AFCEN: download and complete the application form, then send it to the email address of the relevant subcommittee.